According to a Deloitte report, the AEC industry is expected to resume in 2022 from the decline caused by the economic downturn caused by COVID-19. Using BIM for Sustainable Design and Construction in India, an Autodesk e-book produced by Geospatial World indicates that the AEC industry makes up 39% of total energy, generating 19% of all gases, energy-related heat, while consuming less than 42% of buildings and work areas. In addition, 30% of the construction work is refurbished and another 30% of the building materials are wasted. At the upcoming conference of the India International Convention and Expo Center (IICC) in New Delhi built at a cost of INR 29,947 crores (USD 4 billion) and planned to host the 2023 G20 Summit, BIM Engineers was one of the building consultants. .
The beauty of BIM
BIM enables:
• Improved collaboration of design and document management,
• Best Rate In terms of time, cost, and price,
• Detecting Early Conflict through Autodesk Navisworks,
• Better management of domain assets and project plans,
• Seamless Data Exchange resulting in minimal data loss
• Improved Construction Quality using advanced solutions using Autodesk Revit.
Solution
By using BIM instead of CAD, plan-to-design, design-to-construction, and build-to-supply processes have become more accessible and robust and have allowed the focus of building design to be more sustainable.BIM engineers have used interactive BIM tools in the form of Autodesk Revit instead of enclosed data in order to overcome these challenges and effectively manage and improve the design and construction process.
“Since Revit is a collaborative forum, bringing all stakeholders to the same place, the data exchange and information sharing process did not go well and the data was shared in real time. Autodesk Revit does that process of defining successful workflow, ”added Praveen Sharma. With the use of BIM technology, this process became seamless, the team began collaborating on the BIM 360 Sharing platform where all data and models were captured in the Cloud, and the team could easily work from home to deliver models and drawings on time. In addition, to find conflict and avoidance, one of the biggest obstacles to any major project is the integration of Autodesk Navisworks. “Navisworks is very successful in managing large projects, especially in this IICC project, Autodesk Navisworks has played a key role in identifying, resolving, and minimizing major design problems and communication conflicts and space planning issues. It assists in navigating (flying and passing) complex project areas to assist designers in identifying and resolving conflicts-related issues. Navisworks also helps create 4D Construction sequences by combining BIM Models with a construction program, ” said Sharma.